IEEE/ICC Minutes Index Spring 1947 to Spring 1999

Presentation Title

Author(s) Affiliation Date Location Appndx Keywords
Midlothian Pilot Project

89S Cambridge, MA V-G Failure-cable
1987 AEIC Cable Engineering Section Cable Operations Report

89S Cambridge, MA V-C Distribution Failure-rate
Advantages of Jacketed Cables

89S Cambridge, MA VI-B Jacket
URD Equipment and Materials Reliability in the Northwest

89S Cambridge, MA V-E Failure-cable Failure-rate Distribution
Semicon Evaluation 600 Days Accelerated Cable Life Test Data

Brown, M. 89S Cambridge, MA V-N Semiconductor Test
Liaison Report to ICC from ANSI 119

Sankey, E. 89S Cambridge, MA X-A Separable-connector
Study on Underground Power Cables of REA Financed Electric Systems

89S Cambridge, MA V-D Failure-cable Failure-rate
Prediction and Measurement of Magnetic Fields in the Vicinity of Transmission Cables

Cooper, J. 89S Cambridge, MA III-A Magnetic Fields Transmission
Migration of Impurities Through the Semiconductive shield - XLPE Interface

Crine, J. 89S Cambridge, MA V-J Research Semiconductor
New Semi-conductive Polyethylene Jacket for Power Cable

Staniszlo, S. 89S Cambridge, MA VI-B Semiconductor
Future Energy Transmission Systems with SF6 Insulated Cables

89S Cambridge, MA V-A SF6 Transmission
Duke Power Company Cable Failures

89S Cambridge, MA V-H Distribution Failure-rate Failure-cable
Double Layer Concept

Hwang, B. BP Polymers 89S Cambridge, MA V-M Insulation Extruded

Tuesday, January 24, 2006 How to Buy Copies of ICC Minutes Page 57 of 166


First Previous Next Last