| | IEEE/ICC Minutes Index Spring 1947 to Spring 1999 |
| | Presentation Title |
| | Author(s) | Affiliation | Date | Location | Appndx | Keywords |
| Detection of Moisture in the Tapes of PILC Cables in the Field |
| | Dima, A. | Utility Equip. | 95F | St. Petersburg, FL | 12-A | PILC Moisture |
| Commonwealth Edison 345kV LPP Splicing School |
| | Johnsen, D. | ComEd | 95F | St. Petersburg, FL | 10-F | 345kV Pipe Type Transmission |
| The Longest 420kV XLPE Cable System in theWorld for the Metropolitan Power Project |
| | Poulsen, H. | NKT Tng. | 95F | St. Petersburg, FL | 7-B | Transmission Project |
| Low Current Capacitive Switching Test on a 25kV System |
| | Bougie, J. | Wis. Power | 95F | St. Petersburg, FL | 10-D | Elbow Transients |
| Failure Analysis Experience at Georgia Power |
| | Champion, T. | Georgia Power | 95F | St. Petersburg, FL | 10-C | Failure Failures Failure-Report |
| Distributed Cable Temperature MonitoringUsing Fiber Optics |
| | Williams, J. | Power Delivery Cons. | 95F | St. Petersburg, FL | 7-C | Fiber Optics Temperature |
| Design Consideration for Separable Connector Interfaces |
| | Stepniak, F. | Elastimold | 95F | St. Petersburg, FL | 10-A | Elbow |
| General Presentation Submarine Link in Thailand |
| | 95F | St. Petersburg, FL | 9-A | Transmission Submarine 115kV |
| Pre-Molded Splice Interface Design at 3M |
| | Hervig, H. | 3M | 95F | St. Petersburg, FL | 10-B | Splice |
| Underwriters Laboratories Activities |
| | 94S | Reno, NV | VIIIA | UL |
| Dielectric Stress Calculations for Shielded Cable Joints and Terminations |
| | Balaska, T. | Insulated Power Cable | 94S | Reno, NV | X-A | Joint Termination |
| | Services |
| M5-A Remotely Operated Scout Inspection Vehicle |
| | Pacific Gas & Elec | 94S | Reno, NV | XI-A | Tools |
| | Tuesday, January 24, 2006 | How to Buy Copies of ICC Minutes | Page 27 of 166 |