IEEE/ICC Minutes Index Spring 1947 to Spring 1999

Presentation Title

Author(s) Affiliation Date Location Appndx Keywords
12kV URD Rehabilitation & Maintenance Policy

Mercado, K. Houston L&P 95F St. Petersburg, FL 5-D Replacement-Cable Failures
Cable Replacement Criteria at Wisconsin Public Service Corporation

Stano, G. Wis. Pub. Service 95F St. Petersburg, FL 5-C Replacement-Cable
Criteria for Cable Replacement

BG&E 95F St. Petersburg, FL 5-B Replacement-Cable
New Strand Design for LV URD Cables

Pirelli 95F St. Petersburg, FL 4-A Conductor
Theoretical Approach for Peel Testing

Chin, H. Whitehouse, R. Cabot 95F St. Petersburg, FL 5-I Strippability
Underground Distribution Cable Replacement Program at Jersey Central Power & Lt.

Holmes, J. Jersey Central P&L 95F St. Petersburg, FL 5-A Replacement-Cable
Ampacity Derating Factors for Installed Cable Configurations

95F St. Petersburg, FL 14-E Ampacity
Results of a Literature Review on the Environmental Qualifications of Low-Voltage Electric Cables

Lofaro, R. Brookhaven Lab 95F St. Petersburg, FL 12-D Cable-low-voltage Research
Cost Control and Outage Time Reduction with First Response UG Cable Fault Locating

McCallister, D. Gnerlich, H. Duke Power 95F St. Petersburg, FL 12-E Fault Locating
Erection and Commissioning of High Voltage Cable Systems in the P.R. China

Meier, A. Brugg 95F St. Petersburg, FL 13-A Transmission XLPe 220kV
The Transmission of Electrical Power by Submaring Cable-A Status Review

Lawson, G. PTI 95F St. Petersburg, FL 13-B Submarine Transmission
Submarine Link in Thailand

Alcatel 95F St. Petersburg, FL. 13-C Submarine 115kV Transmission
In Service Experience on Prefabricated Accessories in the Field of 225kV and Higher Voltage

Favire, E. Silec 95F St. Petersburg, FL 13-D Transmission Accessories

Tuesday, January 24, 2006 How to Buy Copies of ICC Minutes Page 24 of 166


First Previous Next Last