3,000 foot long 25kV submarine cable to Treasure Island Higgins Lake, Michigan , by Henry Soleski, ACMI Consulting, LLC
Abstract: Summary of turnkey project that included removal of the existing cables, installation and burial of the new submarine cable and some terrestrial work to connect to the existing distribution system.   

Rating of submarine cables with 2K temperature rise criterion - George Anders, Anders Consulting
This presentation discusses rating calculations of submarine power cables when a requirement is imposed that the temperature rise caused by cable heating at the specified depth below the sea bottom does not exceed 2K. Such requirements form rating restrictions in several countries; e.g., the Netherlands, Germany, France and other. 

Interconnection Upgrade Using Two 138kV Three-Core Submarine Cables between Prince Edward Island and New Brunswick, Rusty Bascom, Electrical Consulting Engineers
Abstract: The presentation will summarize the project to install two 138kV submarine cables to reinforce the power system and address load growth on Prince Edward Island including.  Details will include a brief history of the need for the project and technical details of the submarine cables. 

Fall 2017

IEEE prohibits discrimination, harassment and bullying. For more information, visit ieee.org/web/aboutus/whatis/policies/p9-26.html
Privacy & Opting Out of Cookies  Terms & Conditions
IEEE ICC PES & Design is a registered trademark of The Institute of Electrical and Electronics Engineers, Inc.

IEEE-ICC-PES